CMP Transmission Line Proposal: A Bad Deal for Maine

What is Central Maine Power’s Proposal for a New Transmission Line? Central Maine Power (CMP) is proposing to build a 145-mile, high-voltage, direct current transmission line, called the New England Clean Energy Connect (NECEC), from Quebec to an interconnection with the existing New England grid in Lewiston. About 53 miles of the transmission line route … Continue reading CMP Transmission Line Proposal: A Bad Deal for Maine