ADDITIONAL RESOURCES

Rollins Wind Project

 

 

 

 

 

 

Click on photo above to see larger pictures.

 

PDFDownload a map of the proposed site

 

PDFDownload a project description and the proposed construction plan


View the complete application

 

Rollins Wind website

 

Read related news stories.

 

 


Rollins Wind Project Location: Lincoln, Lee, Winn, Burlington, and Mattawamkeag, Penobscot County
Developer: First Wind
Project status: Permit approved by DEP, under appeal
NRCM position: Supports this project
Size: 60 MW
Number of turbines: 40 (1.5 MW turbines)
Generation: 168 million kilowatt hours of electric generation per year
Equivalent number of homes supplied per year: 23,608

The Rollins wind project, located in Lincoln and neighboring towns, was the sixth wind project approved for construction in Maine. Construction may begin in the summer of 2010. The blades for this project arrived by ship in Eastport, ME in April 2009. Check out the video here!

Estimated Emissions Avoided:
• CO2 (tons/year): 76,000
• NOx (tons/year): 80
• SOx (tons/year): 200

CO2 Equivalents**
• CO2 emissions from burning 360 railcars’ worth of coal
• CO2 emissions from 160,340 barrels of oil consumed
• Carbon sequestered annually by 15,670 acres of pine or fir forests
• CO2 emissions from 7,825,884 gallons of gasoline consumed

** CO2 Equivalents were calculated using the EPA Greenhouse Gas Equivalencies Calculator